CAPERTANG POND. Department of AUDE and HÉRAULT. “Cost Estima - Lot 436

Lot n° 436
Aller au lot
Estimation :
200 - 250 EUR
Enchérir sur drouot.com
CAPERTANG POND. Department of AUDE and HÉRAULT. “Cost Estima - Lot 436
CAPERTANG POND. Department of AUDE and HÉRAULT. “Cost Estimate and Detailed Breakdown of the Work to Be Performed for the Drainage and Landfill of the CAPERTANG POND.” 9° Department of Bridges and Roads—Manuscript, 13 folio pages. NARBONNE (11), July 10, 1820: (Project overview; Construction of spillways; Location; Siltation canal; Aqueduct over the Caudiès stream; Nazouve aqueduct; Bridge and weirs at Salelles and Ouveillan; London Road; Drainage canals; Latour Canal; Highway bridge; Bridge and Movable Sluice Gates at the Mouth of the Vernede Canal; Counter-canal of the Nissan Plain; Cost Estimate; Narbonne 1823.)
Mes ordres d'achat
Informations sur la vente
Conditions de vente
Retourner au catalogue